Dump Site Needed
ACTIVE
Excavation Contractor Needs Dump Site — 200 Yards
Working a site prep job and generating about 200 yards of clean clay and topsoil mix. Looking for a farm, low spot, or fill site within 15-20 miles. Material is clean — no concrete, debris, or organics. Can haul with tri-axle. Flexible schedule. Willing to pay fair rate per yard.
180 cubic yards
$4.00/cy
Columbus, OH 43228
Expires Dec 31